The
Lofts
Asoke
Construction
Update
as
of
End
of
May
2018:
Overall 78.7%
Completed
Works:
Piling,
Soil
Protection,
Footing,
Passenger
Lift
Pit,
Mechanical
Car
Park
Lift
Pit,
Underground
Water
Tank
work,
Septic
tank
Structural
Work:
90.29%
Overall
Completion.
Up
to
Level
39
Architectural
&
Interior
Work:
73.7%
Overall
Completion.
Up
to
Level
32
MEP
Work:
80%
Overall
Completion.
Up
to
Level
36